Penmann has completed a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://opensocialfactory.com/story23752843/penmann-ltd-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2