1

High-Efficiency 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Project Highlight Newsome has successfully delivered the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. Designed to advance ESG targets, the installation enhances cooling reliability while cutting overall energy usage and CO₂ emissions. https://bookmarkingdepot.com/story20649994/advanced-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story