1

High-Efficiency 400 kW Chiller Installation Achieves £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ discharge. https://bookmark-search.com/story20596139/advanced-400-kw-chiller-installation-secures-fifty-thousand-pounds-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story